Electrical Contractor – Asbestos

Acknowledgement to Great American Environmental Division

While installing new electrical lines in a historic building the contractor used a hole saw to cut through a ceiling. Unknown to the contractor, the saw had inadvertently disturbed and released asbestos-containing insulation material. The contractor had to pay for clean-up costs for the asbestos fibers released throughout the building.

Leave a Reply

Your email address will not be published. Required fields are marked *